• This Forum is for adults 18 years of age or over. By continuing to use this Forum you are confirming that you are 18 or older. No content shall be viewed by any person under 18 in California.

Ingenuity Precision New Trickler

Anyone heard from Ingenuity Precision on shipping dates? If you have received the new trickle would you please share date and order date?
 
Anyone heard from Ingenuity Precision on shipping dates? If you have received the new trickle would you please share date and order date?
I emailed him about a new ETA for the IP Powder Meter System to begin shipping.
He said it was delayed by some machinery that wasn't working properly and the new estimate is to begin shipping in November.
 
That made me laugh. Yeah, you and me both.
No ding at all on Paul, he's bit off a lot to chew given the interest and complexities of suppliers.

I just remembered the money pit and "two weeks" when thinking about all the dates along the way. Personally I never really thought we'd see it before now although I was surprised when he showed off the production version a while back. Scaling up for over 1k orders, that's a bit of work and getting them right will be well worth the wait.
 
No ding at all on Paul, he's bit off a lot to chew given the interest and complexities of suppliers.

I just remembered the money pit and "two weeks" when thinking about all the dates along the way. Personally I never really thought we'd see it before now although I was surprised when he showed off the production version a while back. Scaling up for over 1k orders, that's a bit of work and getting them right will be well worth the wait.
100% agree. Im sure he's going to be so relieved when he starts getting these out the door. And you know they will be perfect. I was thinking November/December back when he was saying March but I think we are getting there.
 
  • Like
Reactions: jxb
After watching the videos on how well it works I ordered one about 2 weeks ago. So my wait is going to be a while, hope he can start getting them shipped for you guys that been on the list for a year. Looks like it will be worth the wait.
 
I emailed him about a new ETA for the IP Powder Meter System to begin shipping.
He said it was delayed by some machinery that wasn't working properly and the new estimate is to begin shipping in November.
Ironically, we heard that same November ETA before...back before Black Friday...in 2023. Just saying. ;)

Here's to hoping we get it in our hands by BF 2025, boys!

I want to be honest, though. I call BS on all these excuses. Instead, I think Paul brought it all in-house and delayed it a year and a half to maximize profits, while at the same time cheapening the build to achieve this.

Gone is the sexy acrylic shield, now having something that looks like my 12 year old printed in the garage; gone is the sexy hopper; now we have something or other that will have many of use ordering a sure-to-follow pyrex replacement. Are these the parts that couldn't be spec'd out and forced the acquisition of machinery ("that isn't working properly")? Or is it the 1987 10-key that's driving the delay? We already had the trickler itself perfectly manufactured, so perhaps the bushing in the $600 bulk dropper (is it more than the housing, the bushing, a knob, a couple of machined and electronic parts?) that couldn't be done professionally elsewhere because of Paul's exacting standards? I'm confused....not really.

It's obvious what's going on, but again, I get it and I can't fault him.

...and I understand the business of doing just this, but stop blowing smoke about the machinery and how no one on the planet can give us the quality Paul demands. ;)
 
Ironically, we heard that same November ETA before...back before Black Friday...in 2023. Just saying. ;)

Here's to hoping we get it in our hands by BF 2025, boys!

I want to be honest, though. I call BS on all these excuses. Instead, I think Paul brought it all in-house and delayed it a year and a half to maximize profits, while at the same time cheapening the build to achieve this.

Gone is the sexy acrylic shield, now having something that looks like my 12 year old printed in the garage; gone is the sexy hopper; now we have something or other that will have many of use ordering a sure-to-follow pyrex replacement. Are these the parts that couldn't be spec'd out and forced the acquisition of machinery ("that isn't working properly")? Or is it the 1987 10-key that's driving the delay? We already had the trickler itself perfectly manufactured, so perhaps the bushing in the $600 bulk dropper (is it more than the housing, the bushing, a knob, a couple of machined and electronic parts?) that couldn't be done professionally elsewhere because of Paul's exacting standards? I'm confused....not really.

It's obvious what's going on, but again, I get it and I can't fault him.

...and I understand the business of doing just this, but stop blowing smoke about the machinery and how no one on the planet can give us the quality Paul demands. ;)

Lol, you couldnt be farther from the truth.

Electronics are ready. If you have a pre-order you can call Paul and get your electronics and powder cup (and IP Trickler if you ordered/need one of those) right now. It will work perfectly and hint hint it even works with V3 thrower if you have one. Also, you can save your charge weights on the new electronics so you dont have to re-setup/tune every time you switch back and forth between powders like with the AT electronics...

Pauls waiting on parts from suppliers for the dropper and windscreen. Once he has those the rest will ship. I spoke to him yesterday.

I have the electronics and powder cup and IP (my second setup for my second scale) on the way, as I already have my first A&D/IP running...
 
Lol, you couldnt be farther from the truth.

Electronics are ready. If you have a pre-order you can call Paul and get your electronics and powder cup (and IP Trickler if you ordered/need one of those) right now. It will work perfectly and hint hint it even works with V3 thrower if you have one. Also, you can save your charge weights on the new electronics so you dont have to re-setup/tune every time you switch back and forth between powders like with the AT electronics...

Pauls waiting on parts from suppliers for the dropper and windscreen. Once he has those the rest will ship. I spoke to him yesterday.

I have the electronics and powder cup and IP (my second setup for my second scale) on the way, as I already have my first A&D/IP running...
I can confirm this as I am doing the same. Seems only parts missing are dropper and windscreen, I have a volumetric dropper so this works well for me till the other parts ship.
 
87% of us already have Adam's v2/v3/v4 and Paul's work of art, the IP trickler, so unsure why people are quoting me telling me we can get another one with some electronics to tide us over while we wait on the tacky shield since mid-2023. lol

So you're saying we have waited >18 months for a 3D printed shield that has changed since the first iteration? Again, the first shield design was sex, but it would have cost a little money, so Paul decided his "exacting standards" necessitated printing a tacky one that he designed in a day after people on the Hide complained a year and a half ago. Your stories aren't making any sense, guys. :)

I love the IP and gladly waited for the bulk dropper setup, still waiting without complaint, just reacting to all the apologists who think it's "exacting standards" and every other shop that can't produce things to spec for Paul, forcing him to buy a bunch of machines (that don't work, apparently) and that it's not a play to manufacture it all himself to maximize profits.

Again, I get it....would have done the same damn thing with more than $1.75 million in preorders. Hell, I'd blow smoke until I got the third CNC machine up and running, also...just reacting to the fake news and misinformation, that's all. No hate. lol

#NothingButLove.

heart-face-i-love-you-2527258927.gif
 
Lol, you couldnt be farther from the truth.

Electronics are ready. If you have a pre-order you can call Paul and get your electronics and powder cup (and IP Trickler if you ordered/need one of those) right now. It will work perfectly and hint hint it even works with V3 thrower if you have one. Also, you can save your charge weights on the new electronics so you dont have to re-setup/tune every time you switch back and forth between powders like with the AT electronics...

Pauls waiting on parts from suppliers for the dropper and windscreen. Once he has those the rest will ship. I spoke to him yesterday.

I have the electronics and powder cup and IP (my second setup for my second scale) on the way, as I already have my first A&D/IP running...
Question - is the powder meter he sends the one that attaches to the system or the one he has in stock as a standalone?
 
Question - is the powder meter he sends the one that attaches to the system or the one he has in stock as a standalone?

That's your choice I guess if you do or do not want a stand... its the same IP trickler... but because windscreens and dumper/brackets aren't ready yet, if you don't get the trickler with stand you won't be able to use it until the windscreen, dumper/bracket ship
 
87% of us already have Adam's v2/v3/v4 and Paul's work of art, the IP trickler, so unsure why people are quoting me telling me we can get another one with some electronics to tide us over while we wait on the tacky shield since mid-2023. lol

So you're saying we have waited >18 months for a 3D printed shield that has changed since the first iteration? Again, the first shield design was sex, but it would have cost a little money, so Paul decided his "exacting standards" necessitated printing a tacky one that he designed in a day after people on the Hide complained a year and a half ago. Your stories aren't making any sense, guys. :)

I love the IP and gladly waited for the bulk dropper setup, still waiting without complaint, just reacting to all the apologists who think it's "exacting standards" and every other shop that can't produce things to spec for Paul, forcing him to buy a bunch of machines (that don't work, apparently) and that it's not a play to manufacture it all himself to maximize profits.

Again, I get it....would have done the same damn thing with more than $1.75 million in preorders. Hell, I'd blow smoke until I got the third CNC machine up and running, also...just reacting to the fake news and misinformation, that's all. No hate. lol

#NothingButLove.

View attachment 1621037

I'd love to know where you get all your "facts" from? Some of us have known Paul long before this product/pre-order ever existed.

And Paul didn't take a penny from anyone, he gauged interest. So I don't know where you think he got $1.75 million in pre-orders. You must know him pretty well....



❤️❤️❤️
 

Upgrades & Donations

This Forum's expenses are primarily paid by member contributions. You can upgrade your Forum membership in seconds. Gold and Silver members get unlimited FREE classifieds for one year. Gold members can upload custom avatars.


Click Upgrade Membership Button ABOVE to get Gold or Silver Status.

You can also donate any amount, large or small, with the button below. Include your Forum Name in the PayPal Notes field.


To DONATE by CHECK, or make a recurring donation, CLICK HERE to learn how.

Forum statistics

Threads
165,280
Messages
2,192,311
Members
78,784
Latest member
Vyrinn
Back
Top