My first option on VFD's are from https://www.automationdirect.com/adc/Shopping/Catalog/Drives Manuals are available online and tech support is first rate. I have had two in my shop for 14 yrs with no problems.
I’ve already talked to him. All is good.While you have your electrician at your home, I'd suggest you have him check your motor wiring and look at the VFD you're considering while he's there. Conversations on the 'net can be difficult for many reasons, but some information you are presenting is a bit confusing. Best to make sure your set-up is what you need.
Just a suggestion, no offence intended to anyone.
Programming the VFD, as long as the documentation is correct and I can get support will be easy-peasy. I do similar every blessed day and have for over 30 years. Try installing an Oracle SuperCluster from landing on the dock to running in production. It’s hairy.Hook up your 220v into the input side of VFD and the 3PH output to motor(three wires). All over switches and controls are laid out in manual and controlled with low voltage(VFD side of drive).
Here is mine wired on bench.
Biggest hurdle is understanding the manual. Read it over and over...once you have an understanding of what is going on...it will fall into place. I've never touched a VFD in my life and got it figured out. I'm far from being a electrician also...then again...I'm sure many electricians never messed with a VFD.
I don't see where NEC would apply or even necessary for your application. If you understand wiring, and I believe you do,.... it's just straight forward wiring. These drives draw very little load. We have large machines that only draw a few amps. Hard to believe so many drives and so little draw. If you have access to MTW wire 14ga is plenty, in or out. We throw away probably more than you will need, so it you have a need speak up, and I'll deliver.Programming the VFD, as long as the documentation is correct and I can get support will be easy-peasy. I do similar every blessed day and have for over 30 years. Try installing an Oracle SuperCluster from landing on the dock to running in production. It’s hairy.
I just don’t have time to either come up to speed on NEC and local regs. Nor do I have time for poor documentation or support. Not when I don’t have to
NEC and local codes come in because I do not have an available 220 outlet in my garage. I need an outlet and I need it done to code...since I’m selling the place in the relatively near future. I believe that that is all that I need the electrician for. From there, I think that I can handle it. Yes, there are other ways to skin this cat. I see having an outlet for the power side of the VFD...or something very close to that idea...as a divide and conquer strategy that will let me get on with this project, doing as much myself as possible, and not having a surprise foul up a sale when I want to move the house. Burnt once, I am now twice shy.I don't see where NEC would apply or even necessary for your application. If you understand wiring, and I believe you do,.... it's just straight forward wiring. These drives draw very little load. We have large machines that only draw a few amps. Hard to believe so many drives and so little draw. If you have access to MTW wire 14ga is plenty, in or out. We throw away probably more than you will need, so it you have a need speak up, and I'll deliver.
Will do.When you install your 220 be sure you run 4 wire to the sub panel. Once you venture into 220v and above and 3ph the white is no longer usable as a ground,( never was) and the green is not to be connected to the neutral/white. 220 is 2-usually black- conductors.
Programming the VFD, as long as the documentation is correct and I can get support will be easy-peasy. I do similar every blessed day and have for over 30 years. Try installing an Oracle SuperCluster from landing on the dock to running in production. It’s hairy.
I just don’t have time to either come up to speed on NEC and local regs. Nor do I have time for poor documentation or support. Not when I don’t have to
NEC always applies when doing work like that in your house if it is in a jurisdiction that has adopted NEC as the electrical code there.I don't see where NEC would apply or even necessary for your application. If you understand wiring, and I believe you do,.... it's just straight forward wiring. These drives draw very little load. We have large machines that only draw a few amps. Hard to believe so many drives and so little draw. If you have access to MTW wire 14ga is plenty, in or out. We throw away probably more than you will need, so it you have a need speak up, and I'll deliver.
Edit........
If you would like to test drive a few different brands of manuals, I can supply also. Yaskawa, Teco, Lenze....
1. I’ve got a Hitachi drive I would send you to try it out as I have never been able to figure out how to program it. Mabie you could figure it out but I wouldn’t recommend trying it. I am a Licensed Master Electrician. I’m going to get one of the Tecos and try it as I have heard good things about them.Hey guys, just a power update on my SB10L project.
I looked into doing the 220 outlet myself and got snowed under in all of the NEC associated with it.
So, I’ve got an electrician coming out Sunday to put in the 220 outlet.
I’ve got to double check my rewiring of the motor from 440 to 220. Just something that occurred to me and I can’t get out of my head.
From there, I’ll start on the VFD part of the project.
In an ideal world, I would have liked to run an initial test of the motor without the VFD in place. You know, the “change one thing at a time” philosophy. But, because I need the VFD for 1P-to-3P conversation, I can’t.
I’ve been following this tutorial. I’m not sold on the Teco VFD. I’m going to do quite a bit of research before selecting one. Looking for models that have awesome support. Life is too short to wade through incorrect documentation written by someone with poor English writing skills
You bring up the very question that I have about my motor. This is a 1965 lathe. I think that it’s likely a 1965 motor. I don’t see anything about being inverter rated.
That brings up the idea of selling it and getting one that is rated for a VFD and its slightly funky waveforms
I’ve talked to industrial maintenance guys who tell me they will put a VFD on aN old motor and run it until it drops then replace with a inverter rated motor. That’s what you should do. It’s the frequency change that will kill a noninverter rated motor. We are not talking thousands of dollars here. You could Mabie get 50 bucks out of the old motor but I doubt it. Used 3phase motors are a dime a dozen. A new motor Mabie 100 bucks or so. No need to overthink it.That’s why I mentioned its age. It’s good to know that it’ll run on it without issues.
I believe that the motor is pretty sealed. Will overheating be an issue if I run it at lower speeds? I’d thought about putting a fan on it, but I don’t see a way for the air to circulate. I’ve got fans from rack mounted servers.
That’s why I mentioned its age. It’s good to know that it’ll run on it without issues.
I believe that the motor is pretty sealed. Will overheating be an issue if I run it at lower speeds? I’d thought about putting a fan on it, but I don’t see a way for the air to circulate. I’ve got fans from rack mounted servers.
^+1You are way over thinking this. Simplest hookup there is a Vfd on a SB lathe. You can use the existing switches on the lathe. Just wire them to the Vfd. You can make this as easy or hard as you want. I made mine hard with a pretty box and Estop and jog switch. If I did again would just use the existing switches. I suggest look at the programming and start the motor slow and stop fast. Push a few buttons and it's done. You have picked the best lathe there is to learn. Most screw ups you just slip the belt. If you overheat anything clambering a barrel you are doing it way wrong. Have fun. Watch a bunch of youtubes.
You guys make a great point. Overthinking is a failing of mine. I’ll wire it up to the existing switch and get going. If I want the other features, I’ll add them incrementally.