• This Forum is for adults 18 years of age or over. By continuing to use this Forum you are confirming that you are 18 or older. No content shall be viewed by any person under 18 in California.

New complete build for a good friend. From start to finish.

From the top down...
Drill cap 1/4×20 bolt 5-6" washer and nuts to lock it down run 2 nuts down half way and tighten strip remaining threads above nuts. I wrap 3/4" tape to fit into pillars counter sink but not touch stock.View attachment 1613378
Black pipe tacked into square tubing...View attachment 1613379
You'll need a hand for attaching the feet to hold center of stand on a chunk of 2x4 with a level to keep things plumb, mine are 1x2 scrap 12" long, tack both sides at bottom then fill the gap with wire.
Now before y'all bust my ballz remember I'm a painter 1st, grinder second, a welder I'm not!!View attachment 1613380raising the center gives clearance for washing down the floor and no wobble of stand.
Stand are strong yet light/easy enough to move without removing stock.
I carried this across the driveway just to see it in the sun as soon as clear was out of dustView attachment 1613381
Great looking work!
 

Upgrades & Donations

This Forum's expenses are primarily paid by member contributions. You can upgrade your Forum membership in seconds. Gold and Silver members get unlimited FREE classifieds for one year. Gold members can upload custom avatars.


Click Upgrade Membership Button ABOVE to get Gold or Silver Status.

You can also donate any amount, large or small, with the button below. Include your Forum Name in the PayPal Notes field.


To DONATE by CHECK, or make a recurring donation, CLICK HERE to learn how.

Forum statistics

Threads
165,792
Messages
2,203,225
Members
79,110
Latest member
miles813
Back
Top