Took the floor and 3 walls to the site today, building the door wall this week and put it all up next weekend with a temporary tarp roof. A simple bowed rod in the center makes a tarp drain well enough to hold the project semi dry while the roof is being prepared. Everything is finished at shop ready to install on site, I use the tree to lift my parts up with help from the truck... and rope is amazing what can be done!
Of course I ate crappie before I left the house....
Of course I ate crappie before I left the house....
Last edited: