I don't know what happened; I just know it did and now we have to deal with it. I am positing a link to what I thought had some interesting thoughts. Some of what made sense to me.
Market Ticker
Market Ticker
Good sensible read.I don't know what happened; I just know it did and now we have to deal with it. I am positing a link to what I thought had some interesting thoughts. Some of what made sense to me.
Market Ticker
It’s going to be back to sails!Dang, it's gonna take a lot of batteries to run those things when we go all in on "lectrical".jd
I'm from N.O. Jackie. It was a interesting experience trying to pass a semi on the old one. The hwy 190 bridge over the river in Baton Rouge is also named after our famous governor Huey P Long.This is a little off topic, but I am in New Orleans this week on a job. I went into Metaire this afternoon, over the Huey P Long Bridge.
This is truly a magnificent structure. It is actually awe inspiring, especially after they performed the widening of the traffic lanes on each side this past decade.
The bridge is one of the engineering marvels of the past and the present. If you love large truss bridges, Louisiana has some of the finest.
I held my phone up and took this picture
NOTE: Government needs to get out of the way. They have never produced or marketed any item civilians can buy in commerce!!!!
Rebuilding the Francis Scott Key Bridge
April 2, 2024
Congress must insist on a loan against future insurance payments and that the bridge is rebuilt with a fast, responsible, and entrepreneurial approach.
by Newt Gingrich
The tragic collapse of the Francis Scott Key Bridge in Baltimore presents an important choice.
We can choose a fast, relatively inexpensive, entrepreneurial rebuild – or a slow, costly, bureaucratic one.
The Biden administration’s anti-entrepreneurial bias for leftwing regulators, union work rules, and virtually unlimited taxpayer funding could all turn the bridge rebuild into an unnecessarily long and expensive project.
There are enormous differences in cost and speed between the two approaches. An aggressive entrepreneurial approach includes incentives for speed and achievement. Paper ridden, red tape-defined, bureaucratic approaches typically let the general public suffer while special interests maximize their access to taxpayer funding.
Sean Kennedy recently captured this difference in the City Journal. He wrote: “Baltimore needs to restore the Francis Scott Key Bridge as quickly as possible—and a model exists to do so.”
Kennedy cited Minnesota Gov. Tim Pawlenty’s remarkable leadership when the I-35W bridge collapsed over the Mississippi River on Aug. 1, 2007. Thirteen people died and another 145 were injured.
Amazingly the bridge reopened within 14 months – three months ahead of schedule.
Gov. Pawlenty relentlessly pushed entrepreneurial approaches. As Kennedy reported: “Federal and state officials ‘fast-tracked’ the bridge’s reconstruction by reducing the regulatory burdens that hamper new construction projects-environmental, safety, labor, and contracting reviews.”
Using an entrepreneurial approach, the officials set a big bonus for the contractors if they got it done on time. They also built in a penalty if the contractors missed their targets. As Kennedy noted, “Crews worked around the clock every day, right through the state’s notorious winter weather.”
Kennedy contrasted this entrepreneurial approach with the rebuilding of the Bayonne Bridge between Staten Island and New Jersey. That project took from 2009 to 2017 and saw significant cost overruns. He also noted, “A much-heralded bridge spanning the Mississippi between Illinois and Iowa across I-74 was more than three decades in the making and ran significantly over budget.”
I reached out to Gov. Pawlenty for his input on this column. He said the stage could be set for a rapid rebuild in Baltimore. As he wrote, it would require: “use of design/build process; heavy use of incentives and disincentives for timeliness; accelerated (but not diminished quality) regulatory/permitting reviews; and great teamwork between local, state, and federal officials.”
As Minnesota political analyst Barry Casselman, wrote, the I-35W project was “A rare case of a public works project finishing not only on time.” He added that the approach really mattered. Another major bridge project in Minneapolis, the Third Avenue Bridge, was renovated under a Democratic-Farmer-Labor Party administration. That project took three-and-a-half years – and it didn’t even require a full rebuild.
We have plenty of other examples of bureaucratic-political public works projects becoming absurdly expensive and taking far too long.
As Spectrum 1 News reported in September 2019 on the New York subway system, “The MTA pays the highest construction costs of any transit agency in the world and it has repeatedly blown budgets and deadlines on large projects.
“In announcing the plan, the MTA did not announce any union reforms that could bring down costs. Its chief construction officer says the agency is working on ways to reduce overruns, for example, by improving planning to avoid changing designs in the middle of a project.”
Perhaps the most infamous recent public works disaster was the $14.8 billion “Big Dig” in Boston.
As NBC News reported in December 2007:
“When the clock runs out on 2007, Boston will quietly mark the end of one of the most tumultuous eras in the city’s history: The Big Dig, the nation’s most complex and costliest highway project, will officially come to an end.
“Don’t expect any champagne toasts.
“After a history marked by engineering triumphs, [tunnel] leaks, epic traffic jams, last year’s death of a motorist crushed by falling concrete panels and a price tag that soared from $2.6 billion to a staggering $14.8 billion, there’s little appetite for celebration.”
The federal, state, and local officials trying to rebuild the Francis Scott Key Bridge should learn the lessons of history and apply the entrepreneurial approach to fast reconstruction.
Finally, while Congress should loan the money to rebuild the bridge, it should also insist that the shipping company responsible for destroying the bridge – and therefore its insurance company – pays for the cost of the failure.
After all of President Joe Biden’s attacks on supposedly greedy corporations, it is ridiculous that his first reaction to the Francis Scott Key Bridge disaster was to bail out the shipping and insurance companies with taxpayer dollars.
Congress must insist on a loan against future insurance payments and that the bridge is rebuilt with a fast, responsible, and entrepreneurial approach.
I think the line is pretty short.
I call him BUTTPLUGOnce rebuilt renamed Butt gig bridge?
Yup… about as long as the one after 9/11…I think the line is pretty short.
I`m sure nobody messed with anything since the crash.Did they go there by train?Well, now the FBI is on the boat and they're going to do an "investigation".
Now we are sure to get the truth......![]()
It won’t be any different. Lying, misleading, misdirecting are all characteristics that destroy trust. Once lost, it is virtually impossible to recover in any public and/or private relationship.FBI or any of the other alphabet agencies still have not found the missing Hillary emails. Why should we think this will be different.?
The Coast Guard has been there from the beginning as should be but,As an ex marine engineer sailing American flag freighters and container ships many years ago, I'm with rwj. The outfit that should be in charge of this investigation is the U.S. Coast Guard; they actually know (really well) what they are doing in this arena, while the FBI is a a bit uneducated in this situation, to say the least.