• This Forum is for adults 18 years of age or over. By continuing to use this Forum you are confirming that you are 18 or older. No content shall be viewed by any person under 18 in California.

Thoughts on a long lead in a barrel

All, as I know there are a number of gunsmiths on the forum here, I would like to kindly ask for your input. I'm looking at project for reducing the wear in the throat of a barrel, but one of the limiting factors will be the requirement for not having rifling for the first 2-4". Essentially a long, non-tapered lead. I'm still investigating machining tolerances, obviously less is better, but if you have particular expectations you look for that input would be greatly appreciated as well.

So my question is: do you believe a bore diameter lead that is long enough to cover the area that becomes fire-cracked from hot/high pressure rounds would be detrimental to accuracy?

If accuracy in affected by a long lead and the lands/grooves really need to start in very close proximity to the ogive of the bullet as it's seated in the case, I will need to re-work my plans or at least make some changes to how it would be implemented.

Thank you all for any input!
 
A 2-4" throat gives a long time for blow by to occur. I would expect terrible coppering from gas cutting and poor accuracy, not to mention possible jacket failures from hitting the rifling at higher speed.
 
^^^
My first reaction was, is he seriously thinking about slamming a bullet into square-edged rifling?

Sounds to me like a bad idea. Combustion gases aside, seems a bit like slamming into a bit of brick wall.

Any misalignment between the precise centerline of the cartridge and the center of the bore, uneven release of the bullet from the neck, will make the bullet impact the bore off-center.

Purpose of the tapered rifling /leade is to mitigate those issues, to guide the bullet into dead center as it is released. You have the base of the bullet still in the case and the front of the bullet fully in the rifling simultaneously.

Essentially, you're shooting a bullet through space, trying to hit the center of the bore. I'm not sure about blowby in that short a distance, but I do think this would a significant (perhaps dangerous) pressure spike when the bullet slams into the rifling. I haven't studied chamber pressure science much so others can comfirm or shoot down that theory...
 

Upgrades & Donations

This Forum's expenses are primarily paid by member contributions. You can upgrade your Forum membership in seconds. Gold and Silver members get unlimited FREE classifieds for one year. Gold members can upload custom avatars.


Click Upgrade Membership Button ABOVE to get Gold or Silver Status.

You can also donate any amount, large or small, with the button below. Include your Forum Name in the PayPal Notes field.


To DONATE by CHECK, or make a recurring donation, CLICK HERE to learn how.

Forum statistics

Threads
166,267
Messages
2,215,517
Members
79,508
Latest member
Jsm4425
Back
Top