What exactly should one be looking for with "pressure signs"?
I am going to work up some loads suggested on the 6BR link but which do not appear in any of my loading manuals. How will I know when I am reaching the max load?
Also, if a primmer gets pierced how drastic are the results?
Should I stay away from fed 205M and use CCI or am I ok with Fed. primmers?
thanks
jer
I am going to work up some loads suggested on the 6BR link but which do not appear in any of my loading manuals. How will I know when I am reaching the max load?
Also, if a primmer gets pierced how drastic are the results?
Should I stay away from fed 205M and use CCI or am I ok with Fed. primmers?
thanks
jer